02 / Change

What should change?
To make the scheme work.

Optimising schemes, and finding a route back to viability for those that have stalled.

Samples of brick, stone, bronze and oak laid out on a table

Schemes stall when the assumptions they were built on move. We find out why, then test design, mix, tenure, phasing and cost options on one basis to find the changes that make the scheme viable again.

Change
The assumptions that have moved are identified.
Connect
Options are traced through cost, programme and sales.
Return
The route that restores value and return is set out.

What we look at

  1. 1Why the scheme has stalled
  2. 2Layout, density, mix and tenure
  3. 3Phasing and peak equity
  4. 4Cost and specification

Services at this stage

What decision needs
to be made next?

Speak to Philip