Contractor cost and programme challenge.
Is the scheme ready to start?

Testing that the costs, programme and assumptions presented by a contractor are correct.

Residential blocks under construction, with tower cranes and a city skyline beyond

Before a contract is signed, the contractor’s price, programme and assumptions are tested. Prelims, sequencing, exclusions and the critical path are checked against the constraints on site, and the time-cost relationship is made explicit.

Questions we answer

  1. 01Is the contractor’s price consistent with the design and the programme?
  2. 02Which assumptions, exclusions and provisional sums carry risk?
  3. 03Are prelims and duration realistic for the site?
  4. 04What is on the critical path, and what sits outside the contractor’s control?

What you receive

  • Cost plan and programme challenge
  • Critical path and interface review
  • Time-cost relationship made explicit
  • Actions to protect start and first occupation