03 / Change

Stalled and unviable schemes.
What should change?

Finding a route back to viability for schemes that have stalled or no longer stack up.

Concrete frame of an apartment building under construction, wrapped in scaffolding

When a scheme has stalled or no longer stacks up, the question is what can change to make it work again. Design, mix, tenure, phasing, cost and programme are tested together to find a route that restores the return.

Questions we answer

  1. 01Why has the scheme stopped working, and which assumptions have moved?
  2. 02What design, mix or tenure changes would restore value?
  3. 03Can phasing or sequencing reduce peak equity?
  4. 04Is there a viable route, and what would it take to restart?

What you receive

  • Diagnosis of why the scheme has stalled
  • Options to restore viability, appraised like for like
  • Revenue, cost and return impact of each option
  • Recommended route to restart

What decision needs
to be made next?

Speak to Philip