Areas
Hertfordshire. Is this the moment for your land?
Hertfordshire needs a lot of new homes and most of it is Green Belt. That tension has shifted in landowners’ favour: most of the county’s districts cannot currently show a five-year supply of housing land, and national policy since December 2024 allows some Green Belt land to be released as grey belt. For the right site, that makes now a good time to look again at what your land could become.

Who it is for
For landowners and farmers with land on the edge of towns and villages, owners of brownfield sites and commercial buildings in Hertfordshire’s towns, and investors and developers bringing schemes forward in the county. We have completed development management work in East Hertfordshire, from buying the site to planning consent and sale.
Housing land supply by district
When a council cannot show five years’ supply of deliverable housing land, national policy tilts the balance in favour of granting permission for sustainable housing schemes, unless the harm clearly outweighs the benefits. The latest published position for each district, checked in November 2026:
| District | Supply | Statement dated | Below five years |
|---|---|---|---|
| Broxbourne | 2.13 years | June 2025 | Yes |
| Dacorum | 1.20 years | June 2026 | Yes |
| East Hertfordshire | 5.95 years | April 2024 | No |
| Hertsmere | 2.56 years | October 2023 | Yes |
| North Hertfordshire | 2.43 years | September 2026 | Yes |
| St Albans | 1.12 years | April 2025 | Yes |
| Stevenage | 8.15 years | April 2025 | No |
| Three Rivers | 1.19 years | April 2026 | Yes |
| Watford | 5.44 years | May 2025 | No |
| Welwyn Hatfield | 1.85 years | April 2025 | Yes |
Positions change each year, and some statements above pre-date the December 2024 changes to how housing need is calculated, so the current figure should always be checked for the specific district.
What to consider
- Green Belt and grey beltSince December 2024, national policy allows development on grey belt land: previously developed land and other Green Belt land that does not strongly contribute to its main purposes. Housing on released Green Belt or grey belt must meet the “golden rules”: a higher level of affordable housing (15 percentage points above the local policy, up to 50%), the necessary infrastructure, and new or improved green space.
- Affordable housingEach district sets its own requirement. Headline policies across Hertfordshire range from about 30% to 50% on larger schemes, with lower figures or none on smaller ones.
- Local plans in fluxSeveral districts are preparing new local plans and have recently run calls for sites. Promoting land through a local plan is slower than an application but can secure an allocation.
- Protected habitatsDevelopment near the Chiltern Beechwoods Special Area of Conservation, which affects much of Dacorum, must mitigate recreational pressure, usually through contributions and new green space. Sites near the Lee Valley wetlands and other protected sites face similar tests.
- County contributionsHertfordshire County Council is the highway and education authority, so larger schemes usually face county requests for highways works, school places and other infrastructure alongside district obligations.
- Values and demandCommuter towns on the lines into London, such as St Albans, Harpenden, Berkhamsted and the Hertford and Ware area, support strong values, which makes smaller sites and conversions viable that would not be elsewhere.
How we help
- Feasibility studies: what the site or building could become, and what each option costs and returns
- Site identification: finding and securing the right site
- Development management: managing the scheme, including the planning process and the right planning consultant
- Delivery strategy for complex sites
- Project management
The options for landowners
- Promote through the local planSubmit the land to the council’s call for sites and support it through the plan process.
- Apply nowWhere the council cannot show a five-year supply, a well-prepared application on a sustainable site may succeed ahead of the local plan.
- Option or promotion agreementA promoter or developer funds the planning work in return for a share of the value or the right to buy.
- Sell with planning, or developSecure consent and sell, bring in a partner, or build out.
Case studies
Guides
Common questions
My land is in the Green Belt. Could it be developed?
Possibly. If it is previously developed land, or does not strongly serve the purposes of the Green Belt, it may count as grey belt, and the council’s housing land supply position matters too. Each site has to be assessed on its own facts.
What does it mean if my council cannot show a five-year housing land supply?
National policy then favours granting permission for sustainable housing schemes unless the harm would clearly outweigh the benefits. It does not guarantee permission, but it improves the chances for a well-located, well-prepared scheme.
Should I put my land forward in the call for sites?
It costs little and keeps the option of an allocation open. It works alongside, not instead of, considering whether an application now would succeed.
Do you work across all of Hertfordshire?
Yes, across all ten districts, and the planning consultant and design team we appoint are chosen for their knowledge of the district concerned.